Ir 280 Ramp over Bikeway Greenbelt
Good Condition26 years old4,807 vehicles/day
Location
| State | Ohio |
| County | Lucas |
| Location | Jct Ir 280 And SR 25 |
| Carries | Ir 280 Ramp |
| Crosses | Bikeway Greenbelt |
| Coordinates | 41.67640, -83.51601 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 65.9 ft (20.1 m) |
| Max Span | 64.0 ft (19.5 m) |
| Deck Width | 30.8 ft (9.4 m) |
| Deck Area | 188.9 sq m |
| Main Spans | 1 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 4,807 (2019) |
| Truck Traffic | 7% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4806247 |