SR 309 over Enoch Ditch

Fair Condition58 years old2,002 vehicles/day

Location

StateOhio
CountyMarion
Location1.21 Mi E Of Sr37
CarriesSR 309
CrossesEnoch Ditch
Coordinates40.64362, -83.35779

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length65.9 ft (20.1 m)
Max Span24.9 ft (7.6 m)
Deck Width44.0 ft (13.4 m)
Deck Area269.3 sq m
Main Spans3
Year Built1968

Traffic

Avg Daily Traffic2,002 (2015)
Truck Traffic18%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number5101298

Nearby Bridges