Interstate 5 SB over Corning Canal
Good Condition61 years old14,000 vehicles/day
Location
| State | California |
| County | Tehama |
| Location | 02-teh-005-r23.04 |
| Carries | Interstate 5 SB |
| Crosses | Corning Canal |
| Coordinates | 40.13112, -122.21964 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 94.2 ft (28.7 m) |
| Max Span | 45.6 ft (13.9 m) |
| Deck Width | 53.1 ft (16.2 m) |
| Deck Area | 464.9 sq m |
| Main Spans | 2 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 14,000 (2015) |
| Truck Traffic | 22% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 08 0114L |