I.r. 271 over I 271 NB Over SR 8
Good Condition59 years old20,052 vehicles/day
Location
| State | Ohio |
| County | Summit |
| Location | Jct Of Ir 271 And SR 8 |
| Carries | I.r. 271 |
| Crosses | I 271 NB Over SR 8 |
| Coordinates | 41.30298, -81.51754 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 338.9 ft (103.3 m) |
| Max Span | 115.2 ft (35.1 m) |
| Deck Width | 91.9 ft (28 m) |
| Deck Area | 2892.4 sq m |
| Main Spans | 4 |
| Year Built | 1967 (reconstructed 2008) |
Traffic
| Avg Daily Traffic | 20,052 (2015) |
| Truck Traffic | 16% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 7709366 |