Township Road 29 over Halfway Run * Benedict
Good Condition49 years old130 vehicles/day
Location
| State | Ohio |
| County | Washington |
| Location | .98 Mi West Of Jct Co 126 |
| Carries | Township Road 29 |
| Crosses | Halfway Run * Benedict |
| Coordinates | 39.41776, -81.58681 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Box Beam - Multiple |
| Total Length | 72.2 ft (22 m) |
| Max Span | 67.3 ft (20.5 m) |
| Deck Width | 24.3 ft (7.4 m) |
| Deck Area | 162.8 sq m |
| Main Spans | 1 |
| Year Built | 1977 (reconstructed 2020) |
Traffic
| Avg Daily Traffic | 130 (2019) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 8433144 |