Interstate 80 WB over Big Bend Road
Fair Condition62 years old13,500 vehicles/day
Location
| State | California |
| County | Placer |
| Location | 03-pla-080-r65.00l |
| Carries | Interstate 80 WB |
| Crosses | Big Bend Road |
| Coordinates | 39.30814, -120.51980 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 185.7 ft (56.6 m) |
| Max Span | 61.0 ft (18.6 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 803.7 sq m |
| Main Spans | 3 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 13,500 (2015) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 19 0122L |