I-84 (hwy 002) over Spanish Hollow Creek
Fair Condition62 years old14,294 vehicles/day
Location
| State | Oregon |
| County | Sherman |
| Location | 002 Mi E Biggs |
| Carries | I-84 (hwy 002) |
| Crosses | Spanish Hollow Creek |
| Coordinates | 45.67296, -120.83099 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 129.9 ft (39.6 m) |
| Max Span | 60.0 ft (18.3 m) |
| Deck Width | 112.5 ft (34.3 m) |
| Deck Area | 1358.3 sq m |
| Main Spans | 1 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 14,294 (2022) |
| Truck Traffic | 33% |
| Lanes On Bridge | 6 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 02133A002 10476 |