Or 99w/holladay Rp over B-146 Steel Br Rp X Uprr
Fair Condition74 years old8,742 vehicles/day
Location
| State | Oregon |
| County | Multnomah |
| Location | NE End Of Steel Bridge |
| Carries | Or 99w/holladay Rp |
| Crosses | B-146 Steel Br Rp X Uprr |
| Coordinates | 45.52880, -122.66714 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 317.9 ft (96.9 m) |
| Max Span | 101.0 ft (30.8 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 1182.2 sq m |
| Main Spans | 6 |
| Year Built | 1952 (reconstructed 1985) |
Traffic
| Avg Daily Traffic | 8,742 (2020) |
| Truck Traffic | 7% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 06683D01WX00044 |