US 730 (hwy 2) over Uprr (juniper Pt Tunnel)
Fair Condition75 years old3,403 vehicles/day
Location
| State | Oregon |
| County | Umatilla |
| Location | 5.7 Mi W Washington ST LN |
| Carries | US 730 (hwy 2) |
| Crosses | Uprr (juniper Pt Tunnel) |
| Coordinates | 45.94874, -119.06264 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Slab |
| Total Length | 129.9 ft (39.6 m) |
| Max Span | 129.9 ft (39.6 m) |
| Deck Width | 32.2 ft (9.8 m) |
| Deck Area | 388.1 sq m |
| Main Spans | 1 |
| Year Built | 1951 |
Traffic
| Avg Daily Traffic | 3,403 (2022) |
| Truck Traffic | 50% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | Railroad |
| Historical Significance | Historical significance is not determined |
| Structure Number | 07369 002 19762 |