Phillipi Canyon RD over I-84 (hwy 002)

Good Condition62 years old20 vehicles/day

Location

StateOregon
CountyGilliam
Location088 Mi E Sherman Gill Cln
CarriesPhillipi Canyon RD
CrossesI-84 (hwy 002)
Coordinates45.69036, -120.49968

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length188.0 ft (57.3 m)
Max Span82.0 ft (25 m)
Deck Width30.5 ft (9.3 m)
Deck Area532.9 sq m
Main Spans3
Year Built1964

Traffic

Avg Daily Traffic20 (2022)
Truck Traffic35%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last Inspection523
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number08944 002C12331

Nearby Bridges