I-405 (hwy 061) Co over HWY 61 NB To HWY 1 NB

Fair Condition53 years old103,251 vehicles/day

Location

StateOregon
CountyMultnomah
LocationEt Fremont Intchge
CarriesI-405 (hwy 061) Co
CrossesHWY 61 NB To HWY 1 NB
Coordinates45.54452, -122.67629

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignBox Beam - Multiple
Total Length1040.0 ft (317 m)
Max Span227.0 ft (69.2 m)
Deck Width43.6 ft (13.3 m)
Deck Area4216.1 sq m
Main Spans6
Year Built1973

Traffic

Avg Daily Traffic103,251 (2022)
Truck Traffic8%
Lanes On Bridge2
Lanes Under Bridge14

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number08958H061 00388

Nearby Bridges