County RD 145 over Daniel Creek/stein Smith
Fair Condition39 years old202 vehicles/day
Location
| State | Oregon |
| County | Coos |
| Location | 001 Mi East Co RD 55 |
| Carries | County RD 145 |
| Crosses | Daniel Creek/stein Smith |
| Coordinates | 43.36266, -124.08298 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 130.9 ft (39.9 m) |
| Max Span | 44.0 ft (13.4 m) |
| Deck Width | 24.0 ft (7.3 m) |
| Deck Area | 291.3 sq m |
| Main Spans | 3 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 202 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 16767 145 00025 |