W. Izee Street over Canyon Creek
Good Condition25 years old219 vehicles/day
Location
| State | Oregon |
| County | Grant |
| Location | Intersection Of HWY 395 |
| Carries | W. Izee Street |
| Crosses | Canyon Creek |
| Coordinates | 44.38771, -118.95007 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 3 — Scour critical |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 37.1 ft (11.3 m) |
| Max Span | 36.1 ft (11 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 137.9 sq m |
| Main Spans | 1 |
| Year Built | 2001 |
Traffic
| Avg Daily Traffic | 219 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 18969 000 00000 |