I-84 (hwy 006) WB over Cnty RD Uprr Alder Crk

Good Condition19 years old5,898 vehicles/day

Location

StateOregon
CountyBaker
Location143 Mi SE Jct Ore 7
CarriesI-84 (hwy 006) WB
CrossesCnty RD Uprr Alder Crk
Coordinates44.66852, -117.62051

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length629.9 ft (192 m)
Max Span239.5 ft (73 m)
Deck Width45.9 ft (14 m)
Deck Area2,688 sq m
Main Spans3
Year Built2007

Traffic

Avg Daily Traffic5,898 (2022)
Truck Traffic45%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number19713 006 31744

Nearby Bridges