4th AVE In Canby over Mollala Forest Rail Road
Fair Condition76 years old130 vehicles/day
Location
| State | Oregon |
| County | Clackamas |
| Location | 0.1 Mi E Jct Redwood |
| Carries | 4th AVE In Canby |
| Crosses | Mollala Forest Rail Road |
| Coordinates | 45.26146, -122.67308 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 70.9 ft (21.6 m) |
| Max Span | 68.9 ft (21 m) |
| Deck Width | 54.1 ft (16.5 m) |
| Deck Area | 356.4 sq m |
| Main Spans | 1 |
| Year Built | 1950 |
Traffic
| Avg Daily Traffic | 130 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 21712 000 00000 |