WB 80-wb 12 Connec over WB 80 On-ramp
Good Condition10 years old15,500 vehicles/day
Location
| State | California |
| County | Solano |
| Location | 04-sol-080-r12.20-frfd |
| Carries | WB 80-wb 12 Connec |
| Crosses | WB 80 On-ramp |
| Coordinates | 38.21102, -122.14744 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 450.1 ft (137.2 m) |
| Max Span | 180.1 ft (54.9 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 1742.4 sq m |
| Main Spans | 3 |
| Year Built | 2016 |
Traffic
| Avg Daily Traffic | 15,500 (2012) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 23 0248F |