Reeder RD over Irrigation Canal

Fair Condition51 years old359 vehicles/day

Location

StateOregon
CountyKlamath
Location0165 Mi From HWY 140
CarriesReeder RD
CrossesIrrigation Canal
Coordinates42.17004, -121.67504

Condition Ratings

Overall ConditionFair
Deck8 (Very Good)
Superstructure7 (Good)
Substructure5 (Fair)
Channel/Waterway7 (Good)
Scour CriticalUnknown

Physical Characteristics

MaterialPrestressed Concrete
DesignSlab
Total Length39.0 ft (11.9 m)
Max Span37.1 ft (11.3 m)
Deck Width32.2 ft (9.8 m)
Deck Area116.6 sq m
Main Spans1
Year Built1975

Traffic

Avg Daily Traffic359 (2020)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection223
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number35C179098100165

Nearby Bridges