Olive School Lane over Mc Cune Creek

Fair Condition29 years old225 vehicles/day

Location

StateCalifornia
CountySolano
Location2.0 Mile S Putah Creek
CarriesOlive School Lane
CrossesMc Cune Creek
Coordinates38.47658, -121.99312

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length26.9 ft (8.2 m)
Max Span25.3 ft (7.7 m)
Deck Width31.5 ft (9.6 m)
Deck Area78.7 sq m
Main Spans1
Year Built1997

Traffic

Avg Daily Traffic225 (2010)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number23C0202

Nearby Bridges