Elwyn Road over Natomas E Tributary No 1

Fair Condition42 years old1,000 vehicles/day

Location

StateCalifornia
CountySacramento
Location0.4 Mi N Rio Linda BLVD
CarriesElwyn Road
CrossesNatomas E Tributary No 1
Coordinates38.72678, -121.46677

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure7 (Good)
Channel/Waterway9 (Excellent)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length48.6 ft (14.8 m)
Max Span23.0 ft (7 m)
Deck Width32.8 ft (10 m)
Deck Area148 sq m
Main Spans2
Year Built1984

Traffic

Avg Daily Traffic1,000 (2002)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number24C0314

Nearby Bridges