Discovery Pk RD over Natomas East Main Drain

Good Condition56 years old1,800 vehicles/day

Location

StateCalifornia
CountySacramento
LocationGarden Highway
CarriesDiscovery Pk RD
CrossesNatomas East Main Drain
Coordinates38.60672, -121.50192

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignTee Beam
Total Length240.2 ft (73.2 m)
Max Span40.0 ft (12.2 m)
Deck Width37.4 ft (11.4 m)
Deck Area834.5 sq m
Main Spans6
Year Built1970

Traffic

Avg Daily Traffic1,800 (2004)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2021
Inspection FrequencyEvery 48 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number24C0360