Cutting BLVD over Interstate 580
Fair Condition37 years old5,000 vehicles/day
Location
| State | California |
| County | Contra Costa |
| Location | 04-cc-580-r3.79-rch |
| Carries | Cutting BLVD |
| Crosses | Interstate 580 |
| Coordinates | 37.92513, -122.36312 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 310.0 ft (94.5 m) |
| Max Span | 154.9 ft (47.2 m) |
| Deck Width | 91.9 ft (28 m) |
| Deck Area | 2,646 sq m |
| Main Spans | 2 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 5,000 (2016) |
| Truck Traffic | 10% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 28 0276 |