Tennent AVE over Pinole Creek
Fair Condition59 years old8,000 vehicles/day
Location
| State | California |
| County | Contra Costa |
| Location | 0.3 Mi S San Pablo AVE |
| Carries | Tennent AVE |
| Crosses | Pinole Creek |
| Coordinates | 38.00244, -122.28847 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 27.9 ft (8.5 m) |
| Max Span | 26.9 ft (8.2 m) |
| Deck Width | 50.5 ft (15.4 m) |
| Deck Area | 130.9 sq m |
| Main Spans | 1 |
| Year Built | 1967 (reconstructed 1997) |
Traffic
| Avg Daily Traffic | 8,000 (2020) |
| Truck Traffic | 1% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 28C0133 |