El Cerro BLVD over San Ramon Creek
Fair Condition35 years old14,827 vehicles/day
Location
| State | California |
| County | Contra Costa |
| Location | 0.2 Mi E Danville BLVD |
| Carries | El Cerro BLVD |
| Crosses | San Ramon Creek |
| Coordinates | 37.82847, -122.00583 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 112.5 ft (34.3 m) |
| Max Span | 109.9 ft (33.5 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 490.5 sq m |
| Main Spans | 1 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 14,827 (2020) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 28C0446 |