SR 79 S.b. over Over Bike Trail Tr.frenc
Good Condition22 years old8,167 vehicles/day
Location
| State | Pennsylvania |
| County | Crawford |
| Location | Union Township |
| Carries | SR 79 S.b. |
| Crosses | Over Bike Trail Tr.frenc |
| Coordinates | 41.59206, -80.17141 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 294.9 ft (89.9 m) |
| Max Span | 146.0 ft (44.5 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 1231.6 sq m |
| Main Spans | 2 |
| Year Built | 2004 |
Traffic
| Avg Daily Traffic | 8,167 (2024) |
| Truck Traffic | 22% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000042363 |