Interstate 205 over Sugar Spur Rr

Fair Condition56 years old47,500 vehicles/day

Location

StateCalifornia
CountySan Joaquin
Location10-sj-205-r7.85-tra
CarriesInterstate 205
CrossesSugar Spur Rr
Coordinates37.76326, -121.41999

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length194.9 ft (59.4 m)
Max Span75.8 ft (23.1 m)
Deck Width58.7 ft (17.9 m)
Deck Area1063.3 sq m
Main Spans4
Year Built1970 (reconstructed 2010)

Traffic

Avg Daily Traffic47,500 (2009)
Truck Traffic12%
Lanes On Bridge3

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number29 0183R

Nearby Bridges