SR 0084 I-84 EB over T-390 (shiny Mt Rd)
Good Condition5 years old7,355 vehicles/day
Location
| State | Pennsylvania |
| County | Pike |
| Location | Palmyra Twp .6 M W Tr 390 |
| Carries | SR 0084 I-84 EB |
| Crosses | T-390 (shiny Mt Rd) |
| Coordinates | 41.35928, -75.21519 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 61.0 ft (18.6 m) |
| Max Span | 58.1 ft (17.7 m) |
| Deck Width | 47.2 ft (14.4 m) |
| Deck Area | 267.8 sq m |
| Main Spans | 1 |
| Year Built | 2021 |
Traffic
| Avg Daily Traffic | 7,355 (2023) |
| Truck Traffic | 39% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000068034 |