S-42-12 over I-85
Good Condition20 years old6,500 vehicles/day
Location
| State | South Carolina |
| County | Spartanburg |
| Location | 4.0 Mi S Greer |
| Carries | S-42-12 |
| Crosses | I-85 |
| Coordinates | 34.88475, -82.19544 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 244.1 ft (74.4 m) |
| Max Span | 133.9 ft (40.8 m) |
| Deck Width | 62.0 ft (18.9 m) |
| Deck Area | 1406.2 sq m |
| Main Spans | 2 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 6,500 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000003109 |