I-95 NB over Pocotaligo Swamp (no. 3)

Fair Condition59 years old18,100 vehicles/day

Location

StateSouth Carolina
CountyClarendon
Location2mi NW Of Manning
CarriesI-95 NB
CrossesPocotaligo Swamp (no. 3)
Coordinates33.73254, -80.21792

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical3 — Scour critical

Physical Characteristics

MaterialConcrete
DesignTee Beam
Total Length180.1 ft (54.9 m)
Max Span29.9 ft (9.1 m)
Deck Width41.3 ft (12.6 m)
Deck Area691.7 sq m
Main Spans6
Year Built1967

Traffic

Avg Daily Traffic18,100 (2023)
Truck Traffic22%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000004986

Nearby Bridges