Hight ST -n880 over SR 77 & S880-n77 Cnnctr
Good Condition13 years old8,500 vehicles/day
Location
| State | California |
| County | Alameda |
| Location | 04-ala-880-27.70-oak |
| Carries | Hight ST -n880 |
| Crosses | SR 77 & S880-n77 Cnnctr |
| Coordinates | 37.76965, -122.22036 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 255.9 ft (78 m) |
| Max Span | 77.8 ft (23.7 m) |
| Deck Width | 26.6 ft (8.1 m) |
| Deck Area | 631.8 sq m |
| Main Spans | 4 |
| Year Built | 2013 |
Traffic
| Avg Daily Traffic | 8,500 (2014) |
| Truck Traffic | 2% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 33 0681S |