Ramp Off I-77 NB over Trib Of Big Cedar Creek
Good Condition20 years old1,800 vehicles/day
Location
| State | South Carolina |
| County | Fairfield |
| Location | 2.5 Mi SW Of Ridgeway |
| Carries | Ramp Off I-77 NB |
| Crosses | Trib Of Big Cedar Creek |
| Coordinates | 34.28172, -80.99506 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Slab |
| Total Length | 149.9 ft (45.7 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 39.0 ft (11.9 m) |
| Deck Area | 543.8 sq m |
| Main Spans | 5 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 1,800 (2023) |
| Truck Traffic | 19% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000009904 |