Interstate 280 NB over Crystal Springs Off-ramp

Fair Condition59 years old49,500 vehicles/day

Location

StateCalifornia
CountySan Mateo
Location04-sm-280-r20.04-sbr
CarriesInterstate 280 NB
CrossesCrystal Springs Off-ramp
Coordinates37.61448, -122.42420

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignBox Beam - Multiple
Total Length250.3 ft (76.3 m)
Max Span114.2 ft (34.8 m)
Deck Width69.6 ft (21.2 m)
Deck Area1617.6 sq m
Main Spans3
Year Built1967

Traffic

Avg Daily Traffic49,500 (2009)
Lanes On Bridge4
Lanes Under Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number35 0196R

Nearby Bridges