Interstate 280 SB over King Drive
Fair Condition59 years old89,000 vehicles/day
Location
| State | California |
| County | San Mateo |
| Location | 04-sm-280-r23.16-dlc |
| Carries | Interstate 280 SB |
| Crosses | King Drive |
| Coordinates | 37.65193, -122.45393 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 158.8 ft (48.4 m) |
| Max Span | 84.6 ft (25.8 m) |
| Deck Width | 69.6 ft (21.2 m) |
| Deck Area | 1026.1 sq m |
| Main Spans | 2 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 89,000 (2009) |
| Truck Traffic | 1% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 225 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 35 0202L |