Grand Avenue WB over Caltrain Uprr Industrial
Fair Condition42 years old12,955 vehicles/day
Location
| State | California |
| County | San Mateo |
| Location | 0.1 Mi E Of US 101 |
| Carries | Grand Avenue WB |
| Crosses | Caltrain Uprr Industrial |
| Coordinates | 37.65539, -122.40596 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Box Beam - Multiple |
| Total Length | 587.9 ft (179.2 m) |
| Max Span | 133.9 ft (40.8 m) |
| Deck Width | 54.1 ft (16.5 m) |
| Deck Area | 2956.8 sq m |
| Main Spans | 5 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 12,955 (2010) |
| Truck Traffic | 10% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 35C0148L |