Fas 125 over Piney Creek
Fair Condition54 years old258 vehicles/day
Location
| State | Tennessee |
| County | Chester |
| Location | 1.4 M N Hardeman Co Line |
| Carries | Fas 125 |
| Crosses | Piney Creek |
| Coordinates | 35.36428, -88.80475 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Concrete |
| Design | Channel Beam |
| Total Length | 66.9 ft (20.4 m) |
| Max Span | 27.9 ft (8.5 m) |
| Deck Width | 28.9 ft (8.8 m) |
| Deck Area | 179.5 sq m |
| Main Spans | 3 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 258 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 12016770003 |