NB Interstate 280 over ST Joseph Avenue
Fair Condition59 years old58,500 vehicles/day
Location
| State | California |
| County | Santa Clara |
| Location | 04-scl-280-12.79 |
| Carries | NB Interstate 280 |
| Crosses | ST Joseph Avenue |
| Coordinates | 37.34087, -122.08941 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 84.6 ft (25.8 m) |
| Max Span | 82.7 ft (25.2 m) |
| Deck Width | 69.6 ft (21.2 m) |
| Deck Area | 547.0 sq m |
| Main Spans | 1 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 58,500 (2009) |
| Truck Traffic | 2% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 122 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 37 0236R |