Fap 3 over SR 3 / I155

Fair Condition47 years old14,291 vehicles/day

Location

StateTennessee
CountyDyer
LocationJunction Of I-155 & SR 3
CarriesFap 3
CrossesSR 3 / I155
Coordinates36.07286, -89.34739

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignBox Beam - Multiple
Total Length219.2 ft (66.8 m)
Max Span118.1 ft (36 m)
Deck Width32.2 ft (9.8 m)
Deck Area654.6 sq m
Main Spans2
Year Built1979 (reconstructed 1997)

Traffic

Avg Daily Traffic14,291 (2021)
Truck Traffic8%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number23I01550036