Fau 2 over SR 2 (dodds Ave)

Fair Condition70 years old8,811 vehicles/day

Location

StateTennessee
CountyHamilton
Location.5 Mi. W Maccallie Tunnel
CarriesFau 2
CrossesSR 2 (dodds Ave)
Coordinates35.03178, -85.26413

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignGirder and Floorbeam
Total Length339.9 ft (103.6 m)
Max Span86.0 ft (26.2 m)
Deck Width31.2 ft (9.5 m)
Deck Area984.2 sq m
Main Spans1
Year Built1956

Traffic

Avg Daily Traffic8,811 (2021)
Truck Traffic4%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number33SR0020020

Nearby Bridges