NB Rp Frm Fau 1126 over Poe Branch

Good Condition50 years old31,888 vehicles/day

Location

StateTennessee
CountyHamilton
Location2.25 Mi. S Of Sr-319 Jct.
CarriesNB Rp Frm Fau 1126
CrossesPoe Branch
Coordinates35.25082, -85.17657

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length30.2 ft (9.2 m)
Max Span9.8 ft (3 m)
Deck Area72.7 sq m
Main Spans2
Year Built1976

Traffic

Avg Daily Traffic31,888 (2021)
Truck Traffic6%
Lanes On Bridge1

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number33SR0290055

Nearby Bridges