Fas 218 over Overflow
Fair Condition38 years old4,855 vehicles/day
Location
| State | Tennessee |
| County | Henry |
| Location | 3 Mi E Of Paris |
| Carries | Fas 218 |
| Crosses | Overflow |
| Coordinates | 36.30183, -88.26266 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 346.1 ft (105.5 m) |
| Max Span | 69.9 ft (21.3 m) |
| Deck Width | 45.9 ft (14 m) |
| Deck Area | 1,477 sq m |
| Main Spans | 5 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 4,855 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 40SR2180003 |