Fap 13 over Pollard Branch

Fair Condition54 years old3,815 vehicles/day

Location

StateTennessee
CountyHouston
Location2.2 Miles South Of Erin
CarriesFap 13
CrossesPollard Branch
Coordinates36.27934, -87.67683

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length44.9 ft (13.7 m)
Max Span12.1 ft (3.7 m)
Deck Width40.0 ft (12.2 m)
Deck Area167.1 sq m
Main Spans3
Year Built1972

Traffic

Avg Daily Traffic3,815 (2021)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number42SR0130003

Nearby Bridges