I75 over Hotchkiss Creek

Fair Condition54 years old52,785 vehicles/day

Location

StateTennessee
CountyLoudon
Location2.2 M SE Of Sr2
CarriesI75
CrossesHotchkiss Creek
Coordinates35.78170, -84.34679

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical4 — Foundations need monitoring

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length26.9 ft (8.2 m)
Max Span12.5 ft (3.8 m)
Deck Area192.7 sq m
Main Spans2
Year Built1972

Traffic

Avg Daily Traffic52,785 (2021)
Truck Traffic6%
Lanes On Bridge4

Inspection & Ownership

Last Inspection924
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number53I00750019