Fap 28 over Branch

Good Condition34 years old9,542 vehicles/day

Location

StateTennessee
CountyMarion
LocationCity Of Whitwell
CarriesFap 28
CrossesBranch
Coordinates35.18604, -85.52599

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length31.2 ft (9.5 m)
Max Span9.8 ft (3 m)
Deck Area104.5 sq m
Main Spans3
Year Built1992

Traffic

Avg Daily Traffic9,542 (2021)
Truck Traffic10%
Lanes On Bridge3

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number58SR0280019

Nearby Bridges