Carver over M.i.d. Main Canal
Fair Condition103 years old2,597 vehicles/day
Location
| State | California |
| County | Stanislaus |
| Location | S/o St. Francis AVE |
| Carries | Carver |
| Crosses | M.i.d. Main Canal |
| Coordinates | 37.72257, -121.02240 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 34.1 ft (10.4 m) |
| Max Span | 17.1 ft (5.2 m) |
| Deck Width | 32.8 ft (10 m) |
| Deck Area | 104 sq m |
| Main Spans | 2 |
| Year Built | 1923 (reconstructed 1966) |
Traffic
| Avg Daily Traffic | 2,597 (2018) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 38C0166 |