Fap 62 over Office Branch

Fair Condition73 years old3,421 vehicles/day

Location

StateTennessee
CountyPutnam
Location1.9 Mi. E. Of Monterey
CarriesFap 62
CrossesOffice Branch
Coordinates36.13484, -85.23387

Condition Ratings

Overall ConditionFair
Channel/Waterway4 (Poor)
Culvert5 (Fair)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length22.0 ft (6.7 m)
Max Span7.9 ft (2.4 m)
Deck Width34.4 ft (10.5 m)
Deck Area70.3 sq m
Main Spans2
Year Built1953

Traffic

Avg Daily Traffic3,421 (2021)
Truck Traffic6%
Lanes On Bridge2

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number71SR0620007

Nearby Bridges