Fowler Road over T.i.d. Ceres Main Canal
Fair Condition41 years old3,000 vehicles/day
Location
| State | California |
| County | Stanislaus |
| Location | W Of Larkspur Lane |
| Carries | Fowler Road |
| Crosses | T.i.d. Ceres Main Canal |
| Coordinates | 37.60122, -120.93636 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 9 (Excellent) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 26.2 ft (8 m) |
| Max Span | 13.1 ft (4 m) |
| Deck Width | 51.8 ft (15.8 m) |
| Deck Area | 126.4 sq m |
| Main Spans | 2 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 3,000 (2009) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 38C0333 |