Padre Lane over T.i.d. Ceres Main Canal
Good Condition2 years old142 vehicles/day
Location
| State | California |
| County | Stanislaus |
| Location | South Of East Hatch Road |
| Carries | Padre Lane |
| Crosses | T.i.d. Ceres Main Canal |
| Coordinates | 37.60895, -120.87783 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 66.6 ft (20.3 m) |
| Max Span | 63.6 ft (19.4 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 217.2 sq m |
| Main Spans | 1 |
| Year Built | 2024 |
Traffic
| Avg Daily Traffic | 142 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 38C0363 |