Fau B200 over Cherry Bayou

Fair Condition66 years old9,793 vehicles/day

Location

StateTennessee
CountyShelby
LocationNew Willow AVE - Memphis
CarriesFau B200
CrossesCherry Bayou
Coordinates35.08678, -89.92948

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length90.9 ft (27.7 m)
Max Span31.2 ft (9.5 m)
Deck Width60.0 ft (18.3 m)
Deck Area506.9 sq m
Main Spans3
Year Built1960

Traffic

Avg Daily Traffic9,793 (2021)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number790B6640001