Fap 300 Exit Rp over I-40 E.b.
Fair Condition49 years old24,567 vehicles/day
Location
| State | Tennessee |
| County | Shelby |
| Location | Sr-300 Ramp / I-40 Ebl |
| Carries | Fap 300 Exit Rp |
| Crosses | I-40 E.b. |
| Coordinates | 35.19009, -90.01423 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 232.0 ft (70.7 m) |
| Max Span | 126.0 ft (38.4 m) |
| Deck Width | 32.2 ft (9.8 m) |
| Deck Area | 692.9 sq m |
| Main Spans | 3 |
| Year Built | 1977 |
Traffic
| Avg Daily Traffic | 24,567 (2021) |
| Truck Traffic | 8% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 79I00400065 |