Fap 3 over I240 & Ramps
Fair Condition57 years old33,042 vehicles/day
Location
| State | Tennessee |
| County | Shelby |
| Location | Sr-3 / I-240 Jct. |
| Carries | Fap 3 |
| Crosses | I240 & Ramps |
| Coordinates | 35.00433, -90.02355 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 306.4 ft (93.4 m) |
| Max Span | 116.1 ft (35.4 m) |
| Deck Width | 78.1 ft (23.8 m) |
| Deck Area | 2222.9 sq m |
| Main Spans | 3 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 33,042 (2021) |
| Truck Traffic | 8% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 79I02400015 |