Fap 3 over I240 & Ramps

Fair Condition57 years old33,042 vehicles/day

Location

StateTennessee
CountyShelby
LocationSr-3 / I-240 Jct.
CarriesFap 3
CrossesI240 & Ramps
Coordinates35.00433, -90.02355

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length306.4 ft (93.4 m)
Max Span116.1 ft (35.4 m)
Deck Width78.1 ft (23.8 m)
Deck Area2222.9 sq m
Main Spans3
Year Built1969

Traffic

Avg Daily Traffic33,042 (2021)
Truck Traffic8%
Lanes On Bridge6
Lanes Under Bridge7

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number79I02400015

Nearby Bridges