Fap 4 over I240 EB & WB & Ramp
Fair Condition43 years old37,328 vehicles/day
Location
| State | Tennessee |
| County | Shelby |
| Location | Sr4 / I240 |
| Carries | Fap 4 |
| Crosses | I240 EB & WB & Ramp |
| Coordinates | 35.08006, -89.95503 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 356.0 ft (108.5 m) |
| Max Span | 107.9 ft (32.9 m) |
| Deck Width | 109.9 ft (33.5 m) |
| Deck Area | 3634.8 sq m |
| Main Spans | 4 |
| Year Built | 1983 |
Traffic
| Avg Daily Traffic | 37,328 (2021) |
| Truck Traffic | 9% |
| Lanes On Bridge | 5 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 79I02400095 |